Rivers · Delta · Bayelsa

Stop paying
for power
you don't own.

LumaGrid installs reliable solar systems across the Niger Delta — with full transparency, genuine panel brands, real warranties, and engineers you can call back.

Get Free Quote on WhatsAppSize My System →
₦0
Generator costs after install
3
States covered
Free
Site assessment
Solar installation by LumaGrid
Solar installation by LumaGrid
Scroll
100%Genuine panel brands
2yrWorkmanship warranty
10yrPanel performance warranty
CACRegistered Nigerian business
What We Do

Built for the Niger Delta,
not just Nigeria.

Residential Solar

Full off-grid and hybrid systems for homes across the Niger Delta. Designed around your actual load — not guesswork.

🏭

Commercial Systems

High-capacity installations for businesses, cold rooms, telecoms, and industrial facilities.

🔧

Maintenance & Repair

Regular servicing, panel cleaning, inverter diagnostics, and emergency call-outs across Rivers, Delta, and Bayelsa.

📊

Energy Audit

We assess your load, NEPA history, and usage pattern before recommending a system. No upselling. Just the right fit.

The Process

We show you everything
before you pay a kobo.

01

Free Site Assessment

We visit your property, assess your load requirements and roof condition at zero cost to you.

02

Transparent Proposal

You receive a full breakdown — panel brand, inverter spec, battery count, warranty terms, and total cost. Line by line.

03

Professional Installation

Our certified engineers install to spec. Most residential installs are completed within 1–2 days.

04

Handover & Ongoing Support

We walk you through the system, hand you a warranty document, and stay reachable on WhatsApp after handover.

Financing Available

Go solar today.
Pay over time.

Through our financing partner, you can own a full solar system with as little as 30% upfront and spread the rest over 6, 12, or 24 months. Start saving from day one.

30%
Minimum deposit
24mo
Max repayment
Same day
Installation
Ask About Financing
01

Get a Quote First

We size your system and give you a full cost breakdown before any financing conversation begins.

02

Choose Your Plan

Our financing partner offers 6, 12, and 24-month repayment plans. We'll help you pick what works for your cash flow.

03

Simple Approval

Straightforward documentation process. No hidden charges. You'll know your monthly payment before signing anything.

04

Install Now, Pay Monthly

Your system is installed immediately. You start saving on generator costs from day one while spreading the investment.

Client Reviews

What our customers say.

5.0 on Google · Verified reviews from Google Business ProfileLeave a review →

"LumaGrid gave me a detailed quote before I paid anything. They showed up on time, finished in two days, and my light bill is basically zero now. These guys are the real deal."

Chukwuemeka O.
GRA Phase 2, Port Harcourt
Google

"I was scared of being scammed after hearing stories. But they documented everything — the panels, the inverter brand, the warranty papers. Six months later, still working perfectly."

Mrs. Adaeze N.
Trans Amadi, Rivers State
Google

"Finally no more generator noise at 2am. The system handles my AC and everything. LumaGrid even came back to check on the installation three weeks after. Highly recommended."

Tunde F.
Warri, Delta State
Google
💡
Grow your reviews on Google
After every install, send your customer your GBP review link directly on WhatsApp. Each new review improves your local SEO ranking. Update the TESTIMONIALS array in this file as new reviews come in.
Coverage Area

Serving the Niger Delta,
city by city.

Rivers State

Port HarcourtObio-AkporElemeBonnyOkrika
View Rivers State page →

Delta State

WarriAsabaSapeleUghelliAbraka
View Delta State page →

Bayelsa State

YenagoaBrassOgbiaSagbamaEkeremor
View Bayelsa State page →
FAQ

Questions Nigerians
actually ask.

A basic 3.5KVA system for a 2-bedroom home typically ranges from ₦1.8M to ₦2.8M depending on battery capacity and panel brand. We provide itemised quotes so you see exactly what you're paying for.

Yes. A 1.5HP inverter AC on a 5KVA hybrid system is very achievable. We size the system specifically around your AC usage pattern during the site assessment.

Yes. We cover Rivers, Delta, and Bayelsa states. Travel costs for sites outside Port Harcourt are discussed upfront — no surprise charges.

You WhatsApp us. We respond within 24 hours. Our 2-year workmanship warranty covers any installation-related fault at no cost to you.

Yes. We work with a financing partner who offers 6, 12, and 24-month repayment plans. You can start with as little as 30% deposit and pay the rest monthly.

Free. No pressure. No obligation.

Ready to end your
generator bill forever?

Message us on WhatsApp. We'll schedule a free site visit, assess your load, and send you a full itemised proposal — every naira accounted for.

WhatsApp Us NowCalculate My System